Funding the Final Mile of Infrastructure
This programme seeks NEC approval to direct forty per cent of Bougainville's 0.5% Infrastructure Tax Credit Scheme entitlement toward Soraken's remaining enabling infrastructure.
A Dedicated Fund, A Dedicated Team
This submission seeks NEC approval of enlisting Soraken as an inaugural Bougainville SEZ, and directs the Ministry and Department of Works and Highways to oversee all technical compliance, standards and development associated with national enabling infrastructure at Soraken, covering the allocation of forty per cent of Bougainville's 0.5% Infrastructure Tax Credit Scheme (ITCS) entitlement, and the establishment of a dedicated multidisciplinary project team to prepare a complete engineering package for roads, bridges, water supply, sewerage and wastewater systems, power distribution, telecommunications and fibre-optic networks.
10.3 Scope of Enabling Works
- Upgrading the Soraken–Kesa–Arawa road corridor
- Strengthening and expanding the Soraken wharf
- Installing telecommunications towers and digital backbone infrastructure
- Upgrading power distribution systems, including integration with the 10MW Solar Park
- Improving airport access roads and logistics routes
What Full Activation Delivers
Once enabling infrastructure is completed and the zone is fully operational, Soraken is projected to mobilise substantial private investment by 2035 through downstream cocoa processing, fisheries, logistics, tourism and the emerging digital economy.
A Whole-of-Government Partnership
Implementation is led by the Ministry of Works and Highways, supported by ABG technical teams and contracted engineering firms, with a dedicated Infrastructure Account and an independently managed Project Management Unit.
Department of Treasury, Department of National Planning and Monitoring, and Department of Commerce.
Special Economic Zones Authority and Investment Promotion Authority guide compliance and investor mobilisation.
PNG Power, Water PNG, National Maritime Safety Authority, National Airports Corporation and the Digital Transformation Agency.
Three Options for the National Executive Council
All enabling works will comply with environmental safeguards, sitting within gazetted planning zones, with renewable energy and modern utilities expected to have a net positive environmental impact.